Call Us: 0191 373 3374
8am - 5pm Monday - Friday
Get In Touch

Portfolio Left & Right Large Thumbnail

Portland Road Student Accommodation (Phases 1-8)

Site set up, Infrastructure roads, Surface and Foul drainage, Building RC foundations, Lower and upper floor concrete slabs, External hard landscaping.

Excelsior Academy

Surface and Foul drainage, Pitch drainage, Concrete foundations, Ground floor concrete slabs, Services ducting and trenching, External hard landscaping.

Ingleby Manor Primary School

Site establishment, RC foundations, RC ground and upper floors, MUGA Pitch, External hard and soft landscaping.

Hylton Castle Primary School

Site set up, Infrastructure roads, Surface and Foul drainage, Building RC foundations, Lower and upper floor concrete slabs, External hard landscaping.

Lingey House Primary School

Site establishment, Muckshift, Infrastructure roads, Surface and Foul drainage including attenuation tanks, Building RC foundations, Lower and upper floor concrete slabs, External hard landscaping.
1 4 5 6 7